Notification Period:
03 May 2022

๐”๐ฉ๐๐š๐ญ๐ž ๐จ๐ง ๐ฐ๐š๐ญ๐ž๐ซ ๐ฌ๐ฎ๐ฉ๐ฉ๐ฅ๐ฒ ๐ญ๐จ ๐ญ๐ก๐ž ๐๐จ๐ซ๐ญ๐ก, ๐‚๐จ๐ซ๐ž ๐š๐ง๐ ๐’๐จ๐ฎ๐ญ๐ก:

Our teams are still in the field trying to repair the damage to the mainline. Hopefully by tomorrow, water supply to the North and Core areas will be restored. For the South, the repair work is still ongoing.

In the mean time, Thromde water tankers will also be circulating the affected areas (Babesa and Olakha) from 8 am on May 4.